Contiform 3 – General operation tasks and procedures

Item number: POT3

Partner: KRONES AG - Academy

Orderable 🛈

Price on request

pieces


Product description

Necessary prior knowledge:

Contiform 3 – basics of operation

Modules & Topics:

Get together, safety instructions, overview of the entire machine

  • Safety instructions
  • Safeties/interlocks/media
  • Overview preform conveyor
  • Overview heating and blowing module

Operator tasks

  • Prepare for production
  • During production
  • End of production

Change-over

  • Type change
  • Handling parts
  • Emptying the system

Cleaning and hygienic basics

  • Cleaning parts, basics of hygiene
  • Basic understanding of hygiene

 


24 h Delivery

With a 24 h delivery, we send you the available products within one day. Just select products with the 24 h symbol.
Please note that for this option you will be charged additional costs.

Partial delivery

With a partial delivery, we will send you the available products within a few days. Just select the products that you want to have immediately.
Please note that for this option you will be charged additional shipment costs.

Further services

Stock-keeping Package

Stock-keeping Package

Minimize downtimes with a tailor-made stock-keeping Package

Discover now

Upgrades

Upgrades

Maintain or optimize the productivity of your existing systems in the long term

Discover now

Substitution lists

Substitution lists

Get a free overview of all replaced materials that are installed in your system

Discover now

Tutorials and Webinars

Tutorials and Webinars

Learn more about Krones.shop functions with the help of tutorials or a Krones expert

Discover now

最後に閲覧

  • Plain bearing bush V 20x26x32x28x5
  • Clamp 70- 90 B12 A2/A2/A2
  • Clamp 12-20 B9 St-Zn/St-Zn
  • Flange bearing RME FA125.8 70x215x66.1
  • Key DIN6885-1 AS 160x22x14 1.0503+CR
  • Threaded rod M18x1000 A2 70 DIN976-1
  • IDLER/TENSION ROLLER  B117/120-0B/FO
  • ねじ込みプラグ
  • PISTON GUIDE RING GP4800370-C321
  • CABLE
  • Shock absorber 12.5mm
  • 注意事項の記号
  • CLAMPING LEVER
  • PIPE CLAMP M8, 1 1/2"
  • HOSE CLAMP
  • FREQUENCY CONVERTER 11KW
  • 機械銘板
  • 注意事項の記号
  • SAFETY INTERLOCK SWITCH
  • CABLE
  • Hose safety catch
  • STATIC CONVERTER
  • PRESSURE GAUGE MA-50-25-G1/4-E-RG-K-SA
  • Butterfly valve B DN050 FVF MA V
Chatbot
close close